Question 1Concept

What is the main purpose of a cross-connection control (backflow prevention) program?

Question 2Math

How many gallons are contained in 500 feet of 8-inch diameter pipe?

Question 3Concept

What causes water to flow through a distribution system pipe?

Question 4Math

A pressure gauge reads 65 psi at a hydrant. What is the equivalent height of water (feet of head)?

Question 5Concept

What is the commonly required minimum horizontal separation between a new water main and a sanitary sewer main?